Gjør som tusenvis av andre bokelskere
Abonner på vårt nyhetsbrev og få rabatter og inspirasjon til din neste leseopplevelse.
Ved å abonnere godtar du vår personvernerklæring.Du kan når som helst melde deg av våre nyhetsbrev.
This book proposes the tool change methods for the excessive tool wear in the construction rules of shield tunnel construction in China. From the perspective of shield tunneling, atmospheric pressure tool change, pressure opening and tool change, and other special techniques, the tool change technologies are proposed.
This book gives a comprehensive introduction to the new geophysical detection theories, methods and technologies of tunnel engineering under complex geological conditions and environments. It mainly focuses on the application of 3D seismic technique, 3D high-power resistivity sounding, and 3D GPR, etc. There are 7 chapters in the book. Chapter 1 introduces the state of the art and developing trends of geophysical detection technologies for tunnel engineering. Chapter 2 analyzes the complex geological conditions and environments for tunnel construction and the latest geophysical detection technologies. Chapter 3 to Chapter 7 systematically elaborate on the 3D seismic techniques, 3D detection technologies for water content in tunnel surrounding rocks, 3D detection technologies for side/back slope, 3D detection technologies for shield tunneling, and 3D detection technologies for collapse treatment of tunnel construction. The book presents numerous case studies to illustrate the applications of these technologies.
The basic principles, scope of application, construction technology and technical points of the key technologies such as the origin and arrival of the shield, crossing the shallow soil in the middle of the river, crossing the guard, and changing the knife and opening the knife are clarified.
Abonner på vårt nyhetsbrev og få rabatter og inspirasjon til din neste leseopplevelse.
Ved å abonnere godtar du vår personvernerklæring.