Gjør som tusenvis av andre bokelskere
Abonner på vårt nyhetsbrev og få rabatter og inspirasjon til din neste leseopplevelse.
Ved å abonnere godtar du vår personvernerklæring.Du kan når som helst melde deg av våre nyhetsbrev.
Oil and Gas are formed from organic material buried deep inside the earth's surface at a specific pressure and temperature conditions. These natural resources are trapped beneath the impermeable layers in porous and permeable rocks known as a reservoir. These Oil and Gas bearing reservoirs can be found onshore or offshore and requires a great marvel of engineering and expertise to explore, reach and produce Oil and Gas from these reservoirs. Initial wells drilled to produce these resources were shallow, simple, and located onshore, however with the increase in their demand drilling engineers reached challenging locations, drilling depths, and followed complex trajectory wells, which has resulted in an increased budget of the project exponentially.Drilling operation planning involves a lot of domain-specific expertise in well trajectory designing, Bottom Hole Assembly (BHA) designing, Drill Bit selection w.r.t formation compressive strength, mud type, and mud weight selection based on pore pressure/fracture pressure/differential sticking limit/wellbore stability limit, drilling string rotational speed and WOB determination based on BHA dynamics. The drilling operational efficiency enhancement is broadly evaluated on:Execution of well without any downhole complications and Increased ROP or drilling rate. Commonly encountered Down hole complications while drilling operations are circulation loss, well influx, and stuck pipe, among these problems, circulation loss is dependent upon formation characteristics and cured by using suitable Lost Circulation Material (LCM) like calcium carbonate (CaCO3), wood fibers, polymers, etc. Well control issue can be resolved by proper selection of mud weight and drilling practices, whereas stuck pipe issue requires a detailed analysis of multiple drilling parameters.Stuck pipe is a situation when the BHA is become immovable inside the wellbore at a particulardepth either due to string pack-off, drill string sticking, stuck in ledges,
Abonner på vårt nyhetsbrev og få rabatter og inspirasjon til din neste leseopplevelse.
Ved å abonnere godtar du vår personvernerklæring.