Norges billigste bøker

Ageing Management of Nuclear Power Plants during Delayed Construction Periods, Extended Shutdown and Permanent Shutdown Prior to Decommissioning

Om Ageing Management of Nuclear Power Plants during Delayed Construction Periods, Extended Shutdown and Permanent Shutdown Prior to Decommissioning

Provides a summarised description of internationally accepted practices. Examples of the national approaches to ageing management for the specific periods of extended shutdown, delayed construction and post final shutdown as applied in the nuclear power plants of participating IGALL Member States are presented.

Vis mer
  • Språk:
  • Engelsk
  • ISBN:
  • 9789201079213
  • Bindende:
  • Paperback
  • Sider:
  • 126
  • Utgitt:
  • 30 juni 2021
  • Dimensjoner:
  • 210x297x0 mm.
  • Vekt:
  • 350 g.
Leveringstid: 2-4 uker
Forventet levering: 25 juli 2024

Beskrivelse av Ageing Management of Nuclear Power Plants during Delayed Construction Periods, Extended Shutdown and Permanent Shutdown Prior to Decommissioning

Provides a summarised description of internationally accepted practices. Examples of the national approaches to ageing management for the specific periods of extended shutdown, delayed construction and post final shutdown as applied in the nuclear power plants of participating IGALL Member States are presented.

Brukervurderinger av Ageing Management of Nuclear Power Plants during Delayed Construction Periods, Extended Shutdown and Permanent Shutdown Prior to Decommissioning



Finn lignende bøker
Boken Ageing Management of Nuclear Power Plants during Delayed Construction Periods, Extended Shutdown and Permanent Shutdown Prior to Decommissioning finnes i følgende kategorier:

Gjør som tusenvis av andre bokelskere

Abonner på vårt nyhetsbrev og få rabatter og inspirasjon til din neste leseopplevelse.