Utvidet returrett til 31. januar 2025

Methodology for manufacturing of Harbour structures (Volume I)

Om Methodology for manufacturing of Harbour structures (Volume I)

The purpose of this book is to present step-by-step requirements and methodology for the construction of port and marine structures with details to build high quality vertical break water (caissons) in accordance with project specifications, applicable codes and standards. In this part (Volume I); We started with a generality about the various Harbour structures and its characteristics, then we presented with details how to make and apply an Organizational diagram of the Quality Assurance Plan (ODQAP) and its Detailed Procedures necessary to reserve and meet the quality requirements for the good control and progress of marine construction works. Afterwards, we present with details how to make and apply an Organizational diagram of the HSE Plan (ODPHSE), and its Detailed Procedures necessary to meet the HSE requirements. We can use ODQAP and ODPHSE in all fields of construction and industry.

Vis mer
  • Språk:
  • Engelsk
  • ISBN:
  • 9786139977284
  • Bindende:
  • Paperback
  • Sider:
  • 664
  • Utgitt:
  • 11. desember 2018
  • Dimensjoner:
  • 229x152x37 mm.
  • Vekt:
  • 957 g.
  • BLACK NOVEMBER
  Gratis frakt
Leveringstid: 2-4 uker
Forventet levering: 22. desember 2024
Utvidet returrett til 31. januar 2025

Beskrivelse av Methodology for manufacturing of Harbour structures (Volume I)

The purpose of this book is to present step-by-step requirements and methodology for the construction of port and marine structures with details to build high quality vertical break water (caissons) in accordance with project specifications, applicable codes and standards. In this part (Volume I); We started with a generality about the various Harbour structures and its characteristics, then we presented with details how to make and apply an Organizational diagram of the Quality Assurance Plan (ODQAP) and its Detailed Procedures necessary to reserve and meet the quality requirements for the good control and progress of marine construction works. Afterwards, we present with details how to make and apply an Organizational diagram of the HSE Plan (ODPHSE), and its Detailed Procedures necessary to meet the HSE requirements. We can use ODQAP and ODPHSE in all fields of construction and industry.

Brukervurderinger av Methodology for manufacturing of Harbour structures (Volume I)



Finn lignende bøker
Boken Methodology for manufacturing of Harbour structures (Volume I) finnes i følgende kategorier:

Gjør som tusenvis av andre bokelskere

Abonner på vårt nyhetsbrev og få rabatter og inspirasjon til din neste leseopplevelse.