Utvidet returrett til 31. januar 2025

Planning for a project using GERT

Om Planning for a project using GERT

GERT (Graphical Evaluation and Review Technique) is a project management network analysis technique that provides for probabilistic handling of both net-work logic and activity time estimation. Dr. Alan B. Pritsker of Purdue University described the approach in 1966. In comparison to other techniques, GERT is only applied in complicated systems on a very uncommon basis. Nonetheless, the GERT strategy addresses the majority of the PERT/CPM technique's drawbacks. Loops between tasks are possible with GERT. The complexity of the programme (Monte Carlo simulation) required to represent the GERT system is the primary disadvantage of the GERT technique. This study uses GERT to assess a hypothet-ical R&D project, with the goal of enhancing project planning performance, de-termining project analysis, equipment, and resource requirements, and assisting project managers in modifying project strategies and setting contract rates.

Vis mer
  • Språk:
  • Engelsk
  • ISBN:
  • 9786206157960
  • Bindende:
  • Paperback
  • Sider:
  • 84
  • Utgitt:
  • 27. april 2023
  • Dimensjoner:
  • 150x6x220 mm.
  • Vekt:
  • 143 g.
  • BLACK NOVEMBER
  Gratis frakt
Leveringstid: 2-4 uker
Forventet levering: 18. desember 2024

Beskrivelse av Planning for a project using GERT

GERT (Graphical Evaluation and Review Technique) is a project management network analysis technique that provides for probabilistic handling of both net-work logic and activity time estimation. Dr. Alan B. Pritsker of Purdue University described the approach in 1966. In comparison to other techniques, GERT is only applied in complicated systems on a very uncommon basis. Nonetheless, the GERT strategy addresses the majority of the PERT/CPM technique's drawbacks. Loops between tasks are possible with GERT. The complexity of the programme (Monte Carlo simulation) required to represent the GERT system is the primary disadvantage of the GERT technique. This study uses GERT to assess a hypothet-ical R&D project, with the goal of enhancing project planning performance, de-termining project analysis, equipment, and resource requirements, and assisting project managers in modifying project strategies and setting contract rates.

Brukervurderinger av Planning for a project using GERT



Finn lignende bøker
Boken Planning for a project using GERT finnes i følgende kategorier:

Gjør som tusenvis av andre bokelskere

Abonner på vårt nyhetsbrev og få rabatter og inspirasjon til din neste leseopplevelse.