Utvidet returrett til 31. januar 2025

Determination of Face Pressure in EPB Tunneling Machines

Om Determination of Face Pressure in EPB Tunneling Machines

Tunnel Boring Machines are the most commonly used machines in the excavation of urban tunnels. Damage to the structures on the tunnel route during or after the tunnel excavation is one of the most important risks. In urban tunnel excavations, which are generally excavated in weak and difficult ground conditions, machines working with the Earth Pressure Balance Method are used. These machines, prevent the inward movement of the tunnel face and control the amount of settlement by applying pressure to the tunnel face. The most important question here is to determine the amount of pressure to be applied to the tunnel face. There are many widely accepted formulas used in the calculation of the face pressure and these formulas generally try to limit the settlements on the ground by using parameters. In this study, a new formula was developed. This new formula calculates the face pressure required to be applied by EPB to the tunnel face in order to prevent damage to a structure located on the route and within the area to be affected by tunnel excavation, instead of only preventing settlements on the surface.

Vis mer
  • Språk:
  • Engelsk
  • ISBN:
  • 9786207461608
  • Bindende:
  • Paperback
  • Sider:
  • 72
  • Utgitt:
  • 5. februar 2024
  • Dimensjoner:
  • 150x5x220 mm.
  • Vekt:
  • 125 g.
  • BLACK NOVEMBER
  Gratis frakt
Leveringstid: 2-4 uker
Forventet levering: 19. desember 2024

Beskrivelse av Determination of Face Pressure in EPB Tunneling Machines

Tunnel Boring Machines are the most commonly used machines in the excavation of urban tunnels. Damage to the structures on the tunnel route during or after the tunnel excavation is one of the most important risks. In urban tunnel excavations, which are generally excavated in weak and difficult ground conditions, machines working with the Earth Pressure Balance Method are used. These machines, prevent the inward movement of the tunnel face and control the amount of settlement by applying pressure to the tunnel face. The most important question here is to determine the amount of pressure to be applied to the tunnel face. There are many widely accepted formulas used in the calculation of the face pressure and these formulas generally try to limit the settlements on the ground by using parameters. In this study, a new formula was developed. This new formula calculates the face pressure required to be applied by EPB to the tunnel face in order to prevent damage to a structure located on the route and within the area to be affected by tunnel excavation, instead of only preventing settlements on the surface.

Brukervurderinger av Determination of Face Pressure in EPB Tunneling Machines



Finn lignende bøker
Boken Determination of Face Pressure in EPB Tunneling Machines finnes i følgende kategorier:

Gjør som tusenvis av andre bokelskere

Abonner på vårt nyhetsbrev og få rabatter og inspirasjon til din neste leseopplevelse.